A two lane rural roadway connecting Bay Parkway Segment 1 terminus at North Pier Park Drive to the terminus at Nautilus Street. Stormwater facilities with the associated structures and piping, underground utilities, lighting, multi-use trail and bike lane.
This project is anticipated to divert approx. 4,800 weekday trips and 6,100 weekend trips from the already over capacity PCB Parkway in this section as well as improve the LOS for the intersection of SR 79 and PCB Parkway from D to C in the AM peak period. Reduction of 25% in turning movements onto PCB Parkway and SR 79.