This project includes, but is not limited to the construction of 5764 FL channel improvements including the construction of a single lane timber bridge crossing, sodding, seed and mulch, riprap, erosion control, earthwork.
This project could help alleviate some of the flooding for 100 year rainfall events within the Glades basin. This improvement along with a few others, should be able to drop flooding levels approximately 0.6′ in those areas where the most damage occurred to residences.