Harden critical structures at the North Bay Wastewater Treatment Plant to withstand wind loads of up to 184 mph (Miami-Dade code).
As a result of Hurricane Michael many critical structures at the North Bay Wastewater Treatment Plant were severely damaged or destroyed, compromising human safety and the highly sensitive and expensive equipment contained within. Hardening these structure will ensure safety of staff and critical operational equipment during hurricane events, allowing the NBWWTP to continue accepting and treating domestic wastewater and preventing sewer backups within the municipal wastewater systems.