Raising the roadway existing elevation approximately 3′ and providing a stormwater collection system for this basin to include a stormwater facility with associated structures and piping.

During significant rainfall events, this roadway becomes submerged and must be shut down to local traffic only due to flooding.  This roadway provides connection for two subdivisions and two apartment complexes.  Pedestrian traffic is compromised in some locations along this roadway.